Cascade AeroBarrier

(253) 222-6559

  • Home
  • The Process
  • Videos
  • Resources
  • Contact Us
  • Instagram
  • More
    • Home
    • The Process
    • Videos
    • Resources
    • Contact Us
    • Instagram

(253) 222-6559

Cascade AeroBarrier

  • Home
  • The Process
  • Videos
  • Resources
  • Contact Us
  • Instagram

The Process

Step - 1

Step - 1

Step - 1

Equipment is set up at the job site. Conveniently transported by trailer, AeroBarrier install equipment is mobile and portable. The equipment includes a compressor, generator, blower door, emitters, hoses, and the AeroBarrier machine

Step -2

Step - 1

Step - 1

Prep the space. This includes taping or covering any areas that won’t be sealed. Emitters are then set up throughout the area to be sealed.

Step - 3

Step - 1

Step - 3

Pressurize the space with the use of a blower door. A computer does the rest, including the control of temperature, pressure, humidity, and distribution of sealant during the process.

Step - 4

Step - 4

Step - 4

See the results in real-time. Throughout the application process, the computer monitor displays the ACH improvement, allowing you full control over your desired level of envelope tightness and the leakage reduction

Step -5

Step - 4

Step - 4

Run a final blower door test to verify the sealing results. At the end of the process, receive an AeroBarrier Certificate, with a pre and post leakage report.